Module | SW72-370M | SW72-380M | SW72-390M | SW72-400M |
Rated Maximum Power at STC(Wp) | 370 | 380 | 390 | 400 |
Open Circuit Voltage(Voc/V) | 48.23 | 48.67 | 49.11 | 49.55 |
Maximum Power Voltage(Vmp/V) | 39.51 | 39.95 | 40.39 | 40.78 |
Short Circuit Current(Isc/A) | 10.03 | 10.22 | 10.41 | 10.59 |
Maximum Power Current(Imp/A) | 9.37 | 9.52 | 9.67 | 9.82 |
Module Efficiency(%) | 19.06 | 19.58 | 20.09 | 20.61 |
Power Tolerance | -0 ~ +5W | |||
Standard Test Condition(STC) | Irradiance 1000W/m², Cell Temperature 25ºC, Air Mass 1.5 |
A Grade Material
> Antireflective glass
> Translucency of normal luminance is increased by 2%
> Module efficiency is increased by 2%
> Self-cleaning function
> Service life is as long as 25 years (30 years optional)
Solar Cell
> High Efficiency PV Cells
> Appearance Consistency
> Color sorting ensure consistent appearance on each module
> Anti-PID
Frame
* Aluminium extrusion profile with prompt delivery.
* Available in customized surface finish.
* Excellent material for smooth and subtle edges.
* Extrusion for construction and other industrial purposes.
Junction Box
> Conventional standalone edition and engineering custom edition
> Quality diode ensures module running safety
> IP67 protection level
> Heat dissipation
> Long service life
> Quality diode ensures module running safety
> IP67 protection level
> Heat dissipation
> Long service life
Packing & Delivery
PROJECT CASE
Factory off grid system in Jamaica,25KW
Location: Kingston,Jamaica
Developed: 2018
Purpose: Clients factory area often cut off power every day, it has serious problems for their production. Built this off grid
hybrid type system resolve their problem perfectly.
Haiti Hospital off grid in Bonne Fin
Location: Southern Haiti, Hospital Lumiere
Developed: 2019
Purpose: In order to alleviate these issues, SUNWAY spearheaded the construction of a off grid solar system. We designed
the AC-coupled microgrid with the goal of enhanced resiliency for the critical medical center.
EcoStar Hotel
Solar Photovoltaic Grid-Tied 5 kWp - Hotel
Location: Ibague, Tolima, Colombia
Developed: 2018
Purpose: Supply, Installation and commissioning of 5 kWp grid-tied system for self-consumption
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment |
FOB | |||
CNF | 30% T/T in advance, paid the balance against copy of B/L | ||
CIF | |||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||
West Union | Amount lower than 5000usd | ||
Delivery Time | 7~10days after receiving payment for one container |